Wind measurement campaign with six 100 meter masts in Azerbaijan

MNC Turkey was retained to perform a one year measurement campaign.

MNC Turkey was responsible for supply and installation of 6 masts of 100 meters including ultrasonic sensors and winter power supplies for heating sensors for de-icing.MNC Turkey is responsible for the one year operation of the masts. MNC Turkey used local partners to help ensure the project schedule was minimally affected by the 2020 COVID-19 pandemic.

Wind turbine engineer,Engineer maintains and controls wind turbine energy.